October 2004: Falcon

The building frames of the Falcon 44 (project 139) are set up and at the moment the planking of the core cell is started. In- and outside of the hull will be vacuum injected. The composite deck will be build simultaneous with the hull.

August 2004: Beluga

The first Beluga 40 project has a new website, where you can follow the project. Please have a look on: http:⁄⁄snobber.primosite.com

June 2004: Northman

There’s an order for a the preliminary design of the Northman 40 (project 140). The Northman 40 is a mix between the Beluga 40 and the Quaestor 40. We took the lines of the Beluga 40 and the bow and bulwark of the Quaestor 40. The cabin is stretched forward for an acceptable headroom in […]

June 2004: Falcon

The first lines of the Falcon 44 are almost finished. Linesplan, deckplan and sailplan are ready. The Falcon 44 is designed with a retractable liftkeel.

April 2004: Titan

The first Titan 1020 is launched by Jachtwerf van Workum Arnhem bv. The christening was a nice festivity and the owners were very satisfied and proud with their new yacht.

April 2004: Beluga

The preliminary design of the Beluga 40 is almost finished. Linesplan, interior, deckplan and sailplan are ready. The Beluga 40 is designed with a retractable liftkeel and a standard bulbkeel.

March 2004

There’s an order for a 44-feet pilot cutter (design no. 139). This yacht will be built in core-cell.