December 27th 2007: Ten

Mid-December, the management of ‘Expect Sailing’ signed a contract in China for the serial production of the ‘Ten’ (design no. 147). The yacht will be built in a composite sandwich⁄epoxy construction and will be delivered with a carbon mast including PBO rigging.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply